Wastewater Facility Permitting
Permitting Process
The permitting
process is used to help assure that necessary minimum design standards and
criteria are met for all new wastewater facilities and as a periodic check
that the necessary planning, management, operation, and maintenance
requirements are being met.
Wastewater Facility Permitting
EPC is one of a few
local programs that have received delegation from FDEP to issue permits on
behalf of the state for both domestic and industrial wastewater facilities.
This authorization is limited to non-NPDES activities. The permits issues by
EPC DW and IW programs are listed below:
Domestic Wastewater Permit
Type:
Wastewater Treatment Plant
New Construction
Renewal
Substantial Revision
Minor Revision
Transfer
Residuals Management
Residual Management Facility
Land Application Sites
Collection Transmission System
Construction Permit
General Permit
Certificate of Completion (Approval)
Industrial Wastewater
Permit Type:
Wastewater Treatment Plant
New
Construction
Renewals
Substantial Revision
Minor
Revision
Back to Back Ind. Wastewater Permit Transfer
General Permits
Car Wash
Tomato Wash
Laundromat
Concrete Batch Plant
Sand and Limestone Mines
|