Collection Transmission System

 

Individual Permit

General Permit

Certificate of Completion (Approval)


 

 

 

What is an Individual Permit?

 

Collection/transmission systems can typically be constructed under the general permit procedures. However for collection/transmission systems involving innovative design or for collection/transmission systems having features not complying with the design/performance criteria in the rule, a specific (construction) permit will be required.

 

What is required for an Individual Permit?

 

1.      Application Review Fee

2.      Two (2) completed wastewater permit application Form 62-604.300(8)(a) as required by Rule 62-604, F.A.C.

3.      Two (2) sets of signed and sealed Engineering Drawings

4.      All applicable calculations signed and sealed

 

 

 

 

What is a General Permit?
 

A collection/transmission system general permit is a permit issued for the construction of a wastewater collection/transmission system that has been designed in accordance with the standards set forth in Rule 62-604.400(1) and (2), F.A.C., provided that:
(a) The Notice for use of the general permit is filed thirty (30) days prior to initiation of construction; and

            (b) The treatment facility is not under a moratorium of any kind; and

(c) The treatment facility to which the system will be connected has the capacity to receive the wastewater generated by the proposed collection system, and will continue to operate in compliance with all applicable rules.

 

What is required for a General Permit?

 

1.      Application Review Fee

2.      Two (2) completed wastewater permit application Form 62-604.300(7)(c) as required by Section 62-604.700, F.A.C.

3.      Two (2) sets of signed and sealed Engineering Drawings

4.      All applicable calculations signed and sealed

 




What is a Certificate of Completion (Approval)?

 

 

1.      One (1) completed wastewater permit application Form 62-604.300(8)(b) as required by Rule 62-604, F.A.C.

2.      Contact EPC regarding submittal of As Built drawing.

 

 

 

 